BYSS BRACKNELL

BYSS BRACKNELL

Client: ISG

Project: Big Yellow Self Storage Bracknell

Value: £3.7 Million

Period: 48 weeks

Scope of Work

  • Complex Foundation system up to 6m depth
  • Concrete formwork retaining walls and loading bays.
  • Complete storm and foul drainage system
  • Packaged pumping station
  • Services
  • Power float finished concrete slabs.
  • Concrete Service yard
  • Live high flow Thames water sewer diversion
Scope of work
SAINSBURYS ALSAGER
Next Project

SAINSBURYS ALSAGER

Civil Engineering · Structural Repairs · RC Frames · Basements · Groundworks · Highways ·  Civil Engineering · Structural Repairs · RC Frames · Basements · Groundworks · Highways ·