Scope of Work
- Complete groundworks for 52no. plots of 3 ,4 and 5-bedroom
- Strip foundations
- Substructure blockwork
- Block and beam flooring
- Domestic drainage
- Attenuation tanks
- Infrastructure including the construction of all access road.
- Section 50 works connecting foul sewer and 278 works to the main entrance to site and footpaths.